Last close PLN 273.20 up +1.5% As of
CD PROJEKT SA (CDR) WACC
CD PROJEKT SA (CDR) WACC is 9.22%, with a cost of equity of 9.22% and a pre-tax cost of debt of 6.00%. The weighted average cost of capital is the discount rate used to value CD PROJEKT SA's future cash flows. It ranges from 7.72% to 10.71% across the low and high cases, on an adjusted beta of 0.83 and a debt weight of 0.1%.
- WACC:
- 9.22%
- Cost of equity:
- 9.22%
- Cost of debt (pre-tax):
- 6.00%
- Adjusted beta:
- 0.83
- Tax rate:
- 10.0%
- Debt weight:
- 0.1%
CDR discount rate range and cost of capital inputs
CD PROJEKT SA's WACC is 9.22% in the selected case and runs from 7.72% to 10.71% across the low and high cases. Equity is 99.9% of capital (a market capitalisation of PLN 23,039 million) at a cost of equity of 9.22%, and debt is 0.1% (PLN 26 million) at a pre-tax cost of 6.00%, which falls to 5.40% after the 10.0% tax rate.
| Component | Low | Selected | High |
|---|---|---|---|
| Risk-free rate | 5.50% | 5.50% | 5.50% |
| Equity risk premium | 4.50% | 4.50% | 4.50% |
| Adjusted beta | 0.83 | 0.83 | 0.83 |
| Cost of equity | 7.72% | 9.22% | 10.72% |
| Tax rate | 10.0% | 10.0% | 10.0% |
| Equity weight, E / (D + E) | 99.9% | 99.9% | 99.9% |
| Debt weight, D / (D + E) | 0.1% | 0.1% | 0.1% |
| Cost of debt (pre-tax) | 6.00% | 6.00% | 6.00% |
| Cost of debt (after tax) | 5.40% | 5.40% | 5.40% |
| WACC | 7.72% | 9.22% | 10.71% |
CD PROJEKT SA WACC formula with its own numbers
CDR's cost of equity of 9.22% adds the 5.50% risk-free rate to the 4.50% equity risk premium scaled by an adjusted beta of 0.83, the raw beta of 0.74 from the last year of daily returns against its home market moved a third of the way towards 1.00. The WACC of 9.22% then weights that cost of equity at 99.9% against the after-tax cost of debt of 5.40% at 0.1%.
Cost of equity (CAPM)
CDR calculation
Adjusted beta = 0.74 × 2/3 + 1/3 = 0.83.
Weighted average cost of capital
CDR calculation
E is the market capitalisation (PLN 23,039 million), D is total debt (PLN 26 million), Re the cost of equity, Rd the pre-tax cost of debt and t the tax rate.
Assumptions used for the CDR discount rate
- Currency of the rates
- PLN
- Risk-free rate
- 5.50%
- Equity risk premium
- 4.50%
- Cost of debt (pre-tax)
- 6.00%
- Cost of equity range
- ±1.5 points
- Minimum WACC
- 7.0%
- Beta adjustment
- 2/3 raw + 1/3
- Assumptions date
- November 2026