Last close €92.20 up +1.1% As of
Biomerieux SA (BIM) WACC
Biomerieux SA (BIM) WACC is 5.20%, with a cost of equity of 5.35% and a pre-tax cost of debt of 3.30%. The weighted average cost of capital is the discount rate used to value Biomerieux SA's future cash flows. It ranges from 4.30% to 6.62% across the low and high cases, on an adjusted beta of 0.57 and a debt weight of 5.2%.
- WACC:
- 5.20%
- Cost of equity:
- 5.35%
- Cost of debt (pre-tax):
- 3.30%
- Adjusted beta:
- 0.57
- Tax rate:
- 25.8%
- Debt weight:
- 5.2%
BIM discount rate range and cost of capital inputs
Biomerieux SA's WACC is 5.20% in the selected case and runs from 4.30% to 6.62% across the low and high cases. Equity is 94.8% of capital (a market capitalisation of €8,475 million) at a cost of equity of 5.35%, and debt is 5.2% (€461 million) at a pre-tax cost of 3.30%, which falls to 2.45% after the 25.8% tax rate.
| Component | Low | Selected | High |
|---|---|---|---|
| Risk-free rate | 2.80% | 2.80% | 2.80% |
| Equity risk premium | 4.50% | 4.50% | 4.50% |
| Adjusted beta | 0.57 | 0.57 | 0.57 |
| Cost of equity | 3.85% | 5.35% | 6.85% |
| Tax rate | 25.8% | 25.8% | 25.8% |
| Equity weight, E / (D + E) | 94.8% | 94.8% | 94.8% |
| Debt weight, D / (D + E) | 5.2% | 5.2% | 5.2% |
| Cost of debt (pre-tax) | 3.30% | 3.30% | 3.30% |
| Cost of debt (after tax) | 2.45% | 2.45% | 2.45% |
| WACC | 4.30% | 5.20% | 6.62% |
Biomerieux SA WACC formula with its own numbers
BIM's cost of equity of 5.35% adds the 2.80% risk-free rate to the 4.50% equity risk premium scaled by an adjusted beta of 0.57, the raw beta of 0.35 from the last year of daily returns against its home market moved a third of the way towards 1.00. The WACC of 5.20% then weights that cost of equity at 94.8% against the after-tax cost of debt of 2.45% at 5.2%.
Cost of equity (CAPM)
BIM calculation
Adjusted beta = 0.35 × 2/3 + 1/3 = 0.57.
Weighted average cost of capital
BIM calculation
E is the market capitalisation (€8,475 million), D is total debt (€461 million), Re the cost of equity, Rd the pre-tax cost of debt and t the tax rate.
Assumptions used for the BIM discount rate
- Currency of the rates
- EUR
- Risk-free rate
- 2.80%
- Equity risk premium
- 4.50%
- Cost of debt (pre-tax)
- 3.30%
- Cost of equity range
- ±1.5 points
- Minimum WACC
- 4.3%
- Beta adjustment
- 2/3 raw + 1/3
- Assumptions date
- November 2026